Marble Falls Housing Authority
longbar.jpg (7115 bytes)
The Marble Falls Housing Authority was established to provide section 8 housing and affordable living for the residents of Marble Falls.  The two projects that Willis Environmental Engineering, Inc.assisted with are:  Turtle Creek project, a _____ unit complex and the ____________ in Kingsland, a _____ unit complex.

Willis Environmental Engineering, Inc. responsibility on both projects was to design the street, drainage, underground storm drainage, water and wastewater collection system, liftstation, L.C.R.A. - Non-Point source pollution abatement facilities for stormwater control and pollution loading. Willis Environmental Engineering, Inc.also established all pad sites for each of the units, as well as sideways and driveways.

For More Information

longbar.jpg (7115 bytes)
footer.jpg (16919 bytes)

 

© Copyright 2003 by Willis Environmental Engineering, Inc., Marble Falls, TX    All Rights Reserved.
Revised: May 05, 2006

Website Architecture and Hosting by: MegaIQ Website Architects

Visit MegaIQ Website Architects